The production of electricity on Thursday is expected to increase by 15 MW, the Egyptian Electric Utility and Consumer Protection Regulatory Agency said.
The expected maximum electricity load for the day will be 28,200 MW, the same of Wednesday, which saw the minimum load at 21,605 MW, the regulator said in a daily bulletin.
The load indicator appeared in green color from midnight to 12:50 p.m., meaning the load was safe at the time.
Turning orange indicates an urgent need to rationalize consumption, while red is a warning of the high load on the power grid.
GMT 09:55 2017 Saturday ,09 December
Liquefied gas proving to be a natural for energy firmsGMT 08:57 2017 Friday ,08 December
Nuclear fusion project faces delay over US budget cutsGMT 18:01 2017 Monday ,20 November
Rosneft fuels foreign policy goalsGMT 09:35 2017 Sunday ,19 November
China to build $1.6 bn aluminium plant in TajikistanGMT 09:49 2017 Saturday ,18 November
Saudi Arabian Basic Industries Cooperation becomes only Arab company on Thomson Reuters Top 100 Global Energy Leaders listGMT 12:37 2017 Thursday ,16 November
US chemical plants must prepare for more HarveyUS chemical plants must prepare for more HarveyGMT 22:18 2017 Friday ,03 November
Carmakers charge toward electric futureGMT 21:59 2017 Friday ,03 November
Rosatom would bid in KSA nuclear plant tenderMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2023 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2023 ©